St Albans High School For Girls
A summer 2018 install for St Albans High School for Girls. The school is currently extending to gain additional space for increasing pupils and Moduloft was the ideal solution to build and design the bespoke modular space offsite to avoid disruption during the school term.
With a clear brief Moduloft worked closely with Bickerdike Allen Partners on the design and specification for 3 new classrooms and corridor. This project included some special requirements for the school which included acoustics, electrics and floating ceilings.

The Results
St Albans High School for Girls was keen to gain the new space during the 6 week summer holiday while the school was closed. The build was to be completed ahead of the summer break so that lift and install could take place during the 6 weeks and be completed in time for the new term in September. Moduloft expert team carry out all stages of the project which include factory build, delivery of modules, crane to lift into place and install to completion, all to an agreed schedule.
The factory build took 12 weeks, key updates of the progress were communicated every step of the way by the Moduloft team. The delivery and lift was planned for the end of July and took place with ease and all handled by the install team. Any project lift is fully managed by us and includes traffic management, road closures and overall co-ordination on site.
This project was particularly challenging with relatively tight access but the lift of all modules in one day went according to plan. The lift consisted of 6 modules in 2 key sizes to provide 3 classrooms that could each accommodate 30 pupils.
Design and finish for the new space was to produce a modern extension, as the school looks to extend further and combine the original features of this wonderful school with a fresh new modern feel that works to define the future of modular build that is truly bespoke and tailored to the schools specification.
“The Moduloft solution was selected as the most efficient option to deliver 3 new classrooms in the physical space available and within a very tight and time-constrained summer holiday period. We are extremely pleased with the end result that was completed on time and budget, and it looks great both internally and externally.”
Testimonials
Stephen Flower · Google
“Loft conversion completed with only 2-3 weeks of disruption – ModuLoft make miracles happen.”
ModuLoft provided a smooth and professional service from start to finish. Andrew’s design met the brief and the installation team were efficient, effective and on schedule. Tim the MD was communicative throughout and any small issues were dealt with a no-quibble attitude. I cannot recommend this company enough.
David Nicholson · Google
“Hard to tell from the ground floor that work was being carried out upstairs.”
ModuLoft have done an amazing job with our loft conversion. We now have a master bedroom and en-suite with a balcony view from a Velux MK19. Jim & Charlie were superb – we can’t praise them enough for all their hard work. They even hoovered up at the end of each day.
Steven Payne · Google
“Expectations were smashed – install teams have to be seen to be believed.”
Team would be on site at 8AM Monday morning, having driven 5 hours from North Yorkshire to us, and worked through to 8-9 at night. Professional and flexible throughout – last minute changes accommodated. After-sales and snagging support was exemplary. Great to see a British company really excelling at what they do.
Proven across hundreds of homes
We’ve delivered over 355 loft conversions across the country. See a selection of the homes and properties we have transformed.
Ready to add the space your home needs?
Tell us about your project and we’ll come back with a clear, fixed-price quote, no obligation, no pressure.
Other Solutions You Might Be Interested In

SMAS

Gas Safe registered

ISO 9001 Certified

NIC EIC – Domestic Installer

NIC EIC – Approved Contractor

VELUX Certified Installer